MONTAGUE 243W36 Dokumentacja Strona 9

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 24
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 8
SM-9
GAS FIRED BROILERS
9. Reassemble by reversing procedure.
WARNING
ALL GAS JOINTS DISTURBED DURING
SERVICING MUST BE CHECKED FOR LEAKS.
CHECK WITH A SOAP AND WATER SOLUTION
(BUBBLES). DO NOT USE AN OPEN FLAME.
Figure 9. Orifice Assembly
Burner Valve
The burner valves are located on the manifold behind
the control panel cover.
CAUTION
Turn off the gas supply at the manual shutoff
valve that is next to the broiler before
attempting to loosen any gas connections.
1. Remove the control panel cover as described
under COVERS AND PANELS to access the
burner valve.
2. Disconnect the gas line from the back of the
burner valve.
3. Unscrew the burner valve from the manifold.
4. Install the new burner valve.
NOTE: Make sure that the pipe joint compound or
pipe thread sealant that is being used is resistant
to the corrosive actions of liquefied petroleum gases.
5. Connect the gas line to the back of the valve.
6. Turn the main gas shutoff valve to the broiler to the
ON position.
WARNING
ALL GAS JOINTS DISTURBED DURING
SERVICING MUST BE CHECKED FOR LEAKS.
CHECK WITH A SOAP AND WATER SOLUTION
(BUBBLES). DO NOT USE AN OPEN FLAME.
7. Light pilot.
8. Reinstall the control panel cover and control
valve knobs.
9. Turn burner valve full on and check that burner is
properly lit.
Figure 10. Burner Valve
Przeglądanie stron 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 23 24

Komentarze do niniejszej Instrukcji

Brak uwag